Summer Archaeology Update
The last two weeks began our first official start to summer survey and excavation. We have lots of projects this summer to juggle, so we will be bouncing around campus trying to get to them all. Here are some updates from the work we did last week and a couple announcements about where we will be this week.
Two Weeks Ago: Jenison Field House
During this first week of summer survey we did shovel testing in the green areas to the north and west of Jenison field house. We also did a quick walking survey along the river to check for artifacts.
Last Week: Training for New Peoples, Jenison Field House, Adams Field Sidewalks and Training for FRIB
Our week began with a training day for all the new workers, other then myself we have a completely new team from the one we had last year. Our new team includes two undergraduate students, a graduate student and alumni of the Anthropology department. We did a historic tour of campus and visited each of the construction sites we will be working on this summer. Following this, we discussed the summer and went other the proper methods for doing Campus Archaeology summer work.
The work began at Jenison Field House. They are replacing the parking lot and sidewalks here, but we only need to survey the latter. In preparation for this we did some survey around the area, checking out the green space between the sidewalks. We didn’t find anything exciting but we did get interviewed by Channel 10 news!
Our next day of work we were out at Adams Field checking out the sidewalks between the Music Building and Cowles House. They are currently replacing the sidewalks in this area with new ‘green’ sidewalks that are made of recycled MSU glass. You can learn more about this cool initiative here: “Even the concrete is green”. Again, we didn’t find too much although there were some nice square cut nails and a portion of an industrial clay pipe.
Our week ended with us doing a safety training with FRIB (Facility for Rare Isotope Beam). As you can tell driving down Wilson by Bogue, they are working hard to move forward on constructing their new buildings. We will be working with them on a number of projects, but right now we are monitoring their progress on creating the power source for the buildings. It is an exciting project to be a part of, and we are looking forward to it.
This Upcoming Week: Jenison Field House and MSU Museum Sidewalks
This week we have two projects we will be jumping between. The first is the Jenison parking lot where we will be starting to survey underneath the sidewalks. We will be beginning this project today around 12pm and will be out there for the afternoon. Then tomorrow and the next day we will be in the Sacred Space area to the North of the MSU Museum working on sidewalks and potentially checking out some green space if we have time.
As always, feel free to come out and visit us, and follow our progress on twitter @capmsu! Just look for the green flag!
Author: Katy Meyers Emery